亚洲伊人成色综合网

专业的煤气发生炉厂家!郑州科能机械制造有限公司欢迎您!

郑州科能机械制造有限公司

郑州科能机械制造有限公司联系方式
亚洲伊人成色综合网

出售库存的两段式煤气发生炉Sell stock of two stage gas generators

  1、本公司低价出售库存的两段式煤气发生炉单段式煤气发生炉,型号有:3.0米、3.2米、3.4米等,设备全新,电器配件齐全,价格合理,质量优,有意者联系!电话:86-13676907460

  2、本公司可以提供该设备的安装、调试、培训等技术服务。

  3、本公司用户因改产现低价出售二手两段式煤气发生炉、二手回转窑、二手压力机、二手球磨机、二手电捕焦油器、二手脱硫脱硝设备等二手设备,设备八成新以上,本公司可以提供以上设备的拆卸、装车、安装、调试、培训等技术服务。

  4、诚实守信、互利共赢

  5、两段式煤气发生炉调整灰层操作:

    a、出灰,根据炉内气化和烧钎情况,决定是否出灰。宜勤出、少出,不允许一次大量出灰,以免引起火层下降,烧坏炉篦或使炉渣含碳量升高。灰层高度应控制在200~400mm之间。

    b、当灰层高度大于400mm时,可加快炉栅转速。

    c、当灰层高度小于200mm时,可减缓或停止炉栅转速。

    d、局部灰层太厚,灰层高度大于700mm时,应采取捅灰扎实方法处理。

    e、局部灰层太薄,灰层高度小于100mm时,可以打开探火孔,缓缓插入探火钎触及灰层,打成Ф50~60毫米气孔,30分钟后再测灰层高度。

    f、如有结渣,根据轻重程度,决定及时进行打渣处理,并及时调整饱和空气温度。

1, the company sells inventory of two-stage gas generator, single-stage gas generator, models: 3.0m, 3.2m, 3.4m, new equipment, electrical accessories are complete, reasonable price, quality, interested contact!Telephone: 86-13676907460

2. The company can provide the equipment installation, debugging, training and other technical services.

3, the company due to the manufacture of the users sell used two sections of gas generator, used rotary kiln, used machine, ball mill, second-hand second-hand electric tar precipitator, second-hand desulfurization denitration equipment, such as second-hand equipment, more than eighty percent of new equipment, the company can offer the above equipment disassembly, loading, installation, commissioning, training and other technical services.

4. Honesty and trustworthiness, mutual benefit and win-win

5. Operation of adjusting ash layer of two-stage gas generator:

A. Ash discharging shall be decided according to gasification and brazing in the furnace.Should be frequent, less, do not allow a large amount of ash, so as not to cause the fire layer down, burn the grate or slag carbon content increase.The height of ash layer should be controlled between 200 ~ 400mm.

B. When the ash layer height is more than 400mm, the speed of grate can be accelerated.

C. When the ash layer height is less than 200mm, the grate speed can be slowed down or stopped.

D. If the local ash layer is too thick and the height of the ash layer is more than 700mm, it should be handled by stabbing the ash firmly.

E, local gray layer is too thin, gray layer height less than 100 mm, can open fire detecting hole, gently insert fire drill touch the ash layer, Ф 50 ~ 60 mm porosity, layer height measured again after 30 minutes of ashes.

F. If there is slagging, according to the degree of weight, it is decided to timely slag treatment, and timely adjust the saturation air temperature.




上一篇:煤气发生炉检修时安全注意事项内容Contents of safety precautions for gas furnace overhaul 下一篇:没有了